Skip to main content

Switzel International

Design and construction management

Project management and value engineering

Project management, construction management and value engineering for owners and contractors, supported by model-based information so decisions are made on current, shared data.

The problem we solve

Why it matters

Most overruns come from four things: cost, time, stakeholder decisions and poor collaboration on project information. Value engineering is often done too late, when design changes are expensive. We bring project controls and value engineering together with BIM, so options are tested in the model, quantities are known and decisions are traceable.

Tower cranes on a construction site
Value engineering

Our value engineering process

InformationBrief, budget, model and constraints
Function analysisWhat each element must do
Creative workshopAlternatives with the design team
EvaluationCost, time, quality, risk, lifecycle
DevelopmentModel-tested options with quantities
RecommendationDecision report and implementation
P6planning and scheduling
4Dprogram reviewed in the model
5Dquantities for every option
ISO 9001certified quality system
Scope

What we deliver

  • Project planning and scheduling (Primavera P6)
  • Resource allocation, cost estimation and budgeting
  • Progress monitoring and earned value reporting
  • Risk and opportunity management
  • Contract administration, variations and claims support
  • Design validation and constructability reviews
  • Value engineering workshops and option studies
  • Construction management and CEMP
  • Stakeholder and communication management
  • Handover and close-out management
Deliverables

What you receive

DeliverableDescription
Baseline programIntegrated with the BIM model for 4D review
Monthly reportsProgress, cost, risks and early warnings
Value engineering reportOptions, cost and time impact, risks and recommendation
Risk registerOwners, mitigations and status
Close-out packAs-builts, O&M and lessons learned
Questions

Frequently asked questions

At concept and detailed design, before tender. Savings are highest and change costs lowest. We also run VE during construction for packages that are still open.

Yes. We can act for the owner as project manager or PMC, or support a contractor’s project controls team.

Talk to us about project management & value engineering

Send us your EIR, drawings or model, and we will come back with an approach, program and fee proposal.