SYNCHRO 4D sequencing, model-based take-off and BOQs to POMI, CESMM, NRM and employer rules, with three independent checks on every bill. The same teams that build the models measure from them, so quantities reconcile to the design.
Under FIDIC Sub-Clause 12.3, rates change only when the measured quantity crosses defined thresholds. That makes the bill of quantities a risk instrument, and the audit trail behind it is what protects the final account.
For Al Bawani–UCC JV we link the construction program to the federated model in SYNCHRO, model logistics and phasing, and extract 5D quantities from the approved models. 4D and 5D are updated through construction, with laser scanning used to verify progress.
4D MEP sequencing · Four Seasons Resort, Amaala · Red Sea Global
View the Four Seasons Resort project →
| Deliverable | Description |
|---|---|
| Bill of quantities | With basis of measurement note and take-off backup |
| Assumptions and query registers | The evidence behind every quantity |
| 4D simulations | Sequencing, logistics and progress visualization |
| Cost reports | Estimates, cost plans and variance tracking |
POMI, CESMM3 and CESMM4, NRM 1, 2 and 3, MMHW and ICMS 3, plus employer-specific rules. QCS 2014 drives item descriptions in Qatar.
Three checks by people who did not measure it: an arithmetic check, a bulk check against benchmark ratios and a sense check against drawings and specifications.
Send us your EIR, drawings or model, and we will come back with an approach, program and fee proposal.