Employer requirements

BIM requirements we deliver: Ashghal, Qiddiya and client frameworks

A complete view of what Gulf employers ask for, from 3D LOD to COBie and GIS, and how we meet each requirement on your project.

Frameworks

The requirement sets we work to

Public and private employers in Qatar and Saudi Arabia publish their own Exchange Information Requirements. We map every clause to a deliverable in the BEP.

FrameworkTypical content
Ashghal BIM Standards and EIR (Qatar)BEP template, naming, CDE, LOD per stage, BIM Gateway submissions, asset codes, CAD standards
Qiddiya and other giga-project EIRs (Saudi Arabia)Model and data standards, 4D/5D, digital fabrication, GIS, FM handover
Red Sea Global, Qatari Diar, LusailProject EIRs with LOI, COBie and FM system data templates
ISO 19650 parts 1–3Information management across delivery and operations
3D

Model content by stage: LOD and LOI

StageLODModel contentTypical deliverables
ConceptLOD 100Massing, approximate areas and volumesConcept model, area schedules
SchematicLOD 200Generic elements, approximate size and locationSchematic model, coordination study
Detailed designLOD 300Specific elements with accurate size, shape and locationDesign model, clash reports, design drawings
Pre-constructionLOD 350Interfaces, supports and connections between systemsCoordinated model, clash-free report
ConstructionLOD 400Fabrication and installation detailConstruction model, shop drawings, builder’s work
As-builtLOD 500Field-verified elements, often by laser scanAs-built model and drawings, AIM, COBie

Level of information (LOI) is defined per element and stage in the project’s LOD/LOI table, usually as a Model Production and Delivery Table (MPDT).

4D and 5D

Time and cost requirements

4D construction simulation

  • Primavera P6 program linked to the model
  • Phasing, sequencing and logistics models
  • Temporary works and site access
  • Monthly progress visuals against baseline

5D quantities and cost

  • Model-based quantity take-off by discipline
  • Quantities mapped to POMI, CESMM or NRM
  • Validation against BOQ and drawings
  • Quantity dashboards by zone and stage
6D and 7D

Sustainability, COBie and asset management

6D sustainability

  • Energy and daylight analysis from the model
  • GSAS and LEED evidence linked to elements
  • Material and carbon data parameters

7D COBie

  • Facility, Floor, Space, Type, Component, System and Document sheets
  • Validated at each data drop
  • Linked O&M manuals and warranties

Asset management

  • Asset codification to the employer’s schema (for example Ashghal asset codes)
  • Asset register for CAFM import
  • Federated Asset Information Model (AIM)
GIS and CDE

GIS integration and information management

GIS integration

  • Project coordinates tied to the national grid (for example QND95 in Qatar)
  • Utilities and infrastructure models exported to GIS
  • BIM and GIS data for asset and network management

CDE and submissions

  • ISO 19650 CDE states: WIP, Shared, Published, Archived
  • Ashghal BIM Gateway submission packages
  • BCF issue management and audit trail

Have an EIR to respond to?

Send it to us. We return a compliance matrix and pre-appointment BEP that answer every clause.