How we deliver

One integrated team, one CDE, one source of truth

Our production teams work across several offices, but every project runs as one BIM team in one controlled environment, with full traceability and stage-gate quality control.

Delivery philosophy

Six principles on every project

Single common data environment

Autodesk Construction Cloud (Forma) configured to the employer's CDE protocol.

ISO 19650 information management

A standard global workflow, mapped to the EIR.

Employer standards

Ashghal and client BIM standards applied across every discipline.

Single source of information

No duplicate or conflicting data.

Controlled information exchange

Staged review and approval gates.

Multi-level quality assurance

Eight-stage QA/QC governance.

The Switzel project roadmap

From appointment to handover

PlanEIR, MIDP and appointment review; BIM uses agreed
MobilizeBEP in week 1; CDE, templates and team in weeks 2–4
ModelLOD 350 → 400, discipline by discipline
CoordinateWeekly federation and clash detection
Track4D/5D and laser scan verification
CheckEight QA/QC gates before every issue
Hand overLOD 500, AIM, COBie and training
Information management

How information flows: no shortcuts

No information goes directly from modelers to the client. Every exchange passes through defined review and approval stages, logged in the CDE.

Client / consultantRequirement or comment
Design engineersTechnical review
BIM coordinatorTask allocation
BIM modelersProduction
Coordinator reviewInternal check
CDE SharedCoordination
FederationNavisworks / Revizto
QA auditRule-based checks
BIM managerApproval
PublishedIssued to the client
Common data environment

CDE states and approval gates

Work in progressPrivate discipline workspace
SharedInternal review
FederationNavisworks merge
Issue managementBCF and clash log
QA reviewBIM manager audit
PublishedClient-issued
Client reviewConsultant comments
ApprovedAccepted deliverable

Every state change is recorded in the CDE with revision history, approvals, comments and a time-stamped audit trail, to the ISO 19650 CDE protocol.

Model development

LOD 100 → LOD 200 → LOD 300 → LOD 350 → LOD 400 → LOD 500

Concept

LOD 100

  • Massing and conceptual volumes
  • Site, orientation and area studies
  • Early cost and option comparisons
Schematic design

LOD 200

  • Generic systems with approximate sizes and locations
  • Spatial planning and design options
  • Early discipline coordination
Detailed design

LOD 300

  • Specific elements with accurate size, shape and location
  • Design-stage clash detection
  • Tender drawings and quantity take-off
Pre-construction

LOD 350

  • Coordinated discipline models, including interior design and medical equipment where needed
  • Space validation and zone coordination
  • Clash detection and constructability reviews
  • COBie and BIM database initiated
  • Animations and visualizations for stakeholders
Construction

LOD 400

  • Detailed construction coordination models
  • Service routing validation
  • Builder's work and installation-level detail
  • Shop drawings from approved models
  • Construction support modeling per phase
Handover

LOD 500

  • Verified construction information integrated
  • Laser scan overlay and deviation checks
  • Final as-built models and drawings
  • Federated Asset Information Model (AIM)
  • COBie finalized and validated
Coordination

Clash detection and coordination workflow

ModelDiscipline models in Revit
FederateNavisworks or Revizto
DetectAutomated clash rules
LogBCF issues assigned
ResolveModelers correct
Re-runRecheck against rules
CertifyCoordination certificate
Weeklyclash detection
BCFissue tracking format
48 hissue response target
Zerotarget clashes before construction
Quality management

Eight QA/QC gates

No deliverable moves to the next gate until the current stage is reviewed and approved. Pass or fail, at every checkpoint.

G1 Modeler self-check
G2 Coordinator review
G3 Design engineer review
G4 Federated coordination
G5 QA lead audit
G6 BIM manager approval
G7 Drawing production
G8 Drawing QA and submission
CheckWhat we verify
Visual checksNo unintended components; design intent followed
Design reviewTechnical accuracy, scope completeness, schedules and quantities
Standards checkBEP and employer standards: naming, levels, line styles, CAD layers
Model healthWarnings resolved, purged, correct links and worksets
Clash detectionHard and soft clashes, clearance zones
Interface reviewZone, building and cross-discipline interfaces
BIM auditAutomated rule sets for geometry and data integrity
Communication

How we stay connected with your team

ActivityFrequencyParticipants
Production meetingDailyCoordinator and modelers
Discipline coordinationDailyCoordinator and engineers
Cross-discipline meetingTwice weeklyAll coordinators
BIM management meetingWeeklyBIM manager and coordinators
Client coordination meetingWeeklyBIM manager and design leads
Executive reviewMonthlyProject management
Mobilization

Ready to produce in four weeks

  • Week 1: document review (MIDP, EIR, IFC drawings), BEP and team kick-off
  • Week 2: CDE setup, naming conventions, worksets and approval workflows
  • Week 3: QA/QC procedures and checklists, Revit templates and shared coordinates
  • Week 4: baseline models configured, BEP submitted and CDE access for all disciplines

Want to see our BEP and QA procedures?

We can share sample procedures and checklists under NDA as part of a proposal.