Skip to main content

Switzel International

Leadership experience · Metro

Doha Metro Green Line

LOD 350–500 models, laser scanning and as-built documentation for five underground stations.

All projects
The project

Context

Two 16 km twin-bore rail tunnels, six underground stations including one interchange, two switch boxes, six evacuation shafts, one trough and three energy transfer stations. COBie requirements were high, and the project pioneered the laser scanning process for as-builts.

This project was delivered by our CEO, Waqar Uz Zaman, in previous roles, including as Director of Meinhardt BIM Studios in Qatar. It is listed separately from Switzel company projects.

ClientDelivered by our CEO in a previous role
LocationDoha, Qatar
SectorMetro & rail
Doha Metro Green Line
Our scope

What we delivered

  • LOD 350/400 BIM modeling for MEP
  • LOD 500 BIM modeling for architecture, structure and MEP
  • Laser scanning for as-built
  • As-built 3D/2D documentation for five stations
Gallery

From the project

Have a similar project?

We can share detailed references and sample deliverables under NDA.

Contact our Doha team