LOD 300–400 infrastructure models and asset information for a demountable stadium.
All projectsBuilt from shipping containers, removable seats and modular building blocks, this 40,000-seat venue was designed to be dismantled and repurposed after the FIFA World Cup Qatar 2022.
This project was delivered by our CEO, Waqar Uz Zaman, in previous roles, including as Director of Meinhardt BIM Studios in Qatar. It is listed separately from Switzel company projects.
| Client | Delivered by our CEO in a previous role |
| Location | Doha, Qatar |
| Sector | Sports |

We can share detailed references and sample deliverables under NDA.