Time and cost from the model

4D planning, 5D quantities and bills of quantities you can defend

SYNCHRO 4D sequencing, model-based take-off and BOQs to POMI, CESMM, NRM and employer rules, with three independent checks on every bill. The same teams that build the models measure from them, so quantities reconcile to the design.

The problem we solve

Why it matters

Under FIDIC Sub-Clause 12.3, rates change only when the measured quantity crosses defined thresholds. That makes the bill of quantities a risk instrument, and the audit trail behind it is what protects the final account.

Qiddiya Transportation Hub · actual vs planned4D model comparing site progress with the baseline program, week by week.
On our projects

4D and 5D on the Qiddiya Transportation Hub

For Al Bawani–UCC JV we link the construction program to the federated model in SYNCHRO, model logistics and phasing, and extract 5D quantities from the approved models. 4D and 5D are updated through construction, with laser scanning used to verify progress.

4D MEP sequencing · Four Seasons Resort, Amaala · Red Sea Global

Installation sequences for MEP services

View the Four Seasons Resort project →

Branded residential villaWeek-by-week 4D sequence of drainage, chilled water, HVAC, fire protection, electrical and ELV installation.
Y2 building4D construction sequence of MEP services from first fix to final installation.
4D and 5D workflow

From program and model to cost

ProgramPrimavera P6 baseline
Model linkSYNCHRO / Navisworks
4D simulationPhasing, logistics, temporary works
Model-based QTOQuantities from approved models
ValidationAgainst BOQ and drawings
ReportingDashboards by zone and trade
Scope

What we deliver

  • Tender BOQ preparation to POMI, CESMM3/4, NRM 1-3 and employer rules
  • BOQ validation and audit with a variance register
  • 5D model-based take-off, reconciled to manual measurement
  • Interim and final re-measurement, variations and claims
  • Cost planning and estimates
  • 4D construction sequencing and logistics in SYNCHRO
  • 4D progress tracking against the baseline program
Deliverables

What you receive

DeliverableDescription
Bill of quantitiesWith basis of measurement note and take-off backup
Assumptions and query registersThe evidence behind every quantity
4D simulationsSequencing, logistics and progress visualization
Cost reportsEstimates, cost plans and variance tracking
Questions

Frequently asked questions

POMI, CESMM3 and CESMM4, NRM 1, 2 and 3, MMHW and ICMS 3, plus employer-specific rules. QCS 2014 drives item descriptions in Qatar.

Three checks by people who did not measure it: an arithmetic check, a bulk check against benchmark ratios and a sense check against drawings and specifications.

Talk to us about 4d/5d & quantity surveying

Send us your EIR, drawings or model, and we will come back with an approach, program and fee proposal.