LOD 350–500 models, laser scanning and as-built documentation for five underground stations.
All projectsTwo 16 km twin-bore rail tunnels, six underground stations including one interchange, two switch boxes, six evacuation shafts, one trough and three energy transfer stations. COBie requirements were high, and the project pioneered the laser scanning process for as-builts.
This project was delivered by our CEO, Waqar Uz Zaman, in previous roles, including as Director of Meinhardt BIM Studios in Qatar. It is listed separately from Switzel company projects.
| Client | Delivered by our CEO in a previous role |
| Location | Doha, Qatar |
| Sector | Metro & rail |




We can share detailed references and sample deliverables under NDA.