Skip to main content

Switzel International

Leadership experience · Sports

Ras Abu Aboud Stadium (974)

LOD 300–400 infrastructure models and asset information for a demountable stadium.

All projects
The project

Context

Built from shipping containers, removable seats and modular building blocks, this 40,000-seat venue was designed to be dismantled and repurposed after the FIFA World Cup Qatar 2022.

This project was delivered by our CEO, Waqar Uz Zaman, in previous roles, including as Director of Meinhardt BIM Studios in Qatar. It is listed separately from Switzel company projects.

ClientDelivered by our CEO in a previous role
LocationDoha, Qatar
SectorSports
Ras Abu Aboud Stadium (974)
Our scope

What we delivered

  • LOD 300 and LOD 400 BIM modeling for infrastructure, utilities, roads and landscape
  • Asset information management (COBie)

Have a similar project?

We can share detailed references and sample deliverables under NDA.

Contact our Doha team